Assembly and installation of a tubular conveyor

ClientRio Tinto
Field of expertiseIndustrial mechanic
LocationJonquière
Assemblage et installation d'un convoyeur tubulaire

For this industrial mechanics project, our team was responsible for the engineering, assembly, and startup of a 1.6 km tubular conveyor for Rio Tinto.